PROJECT Apartment Design
LOCATION Isfahan - Iran
STATUS Under Construction
COMPLETION By 2026
First Floor Plan
While the kitchen facade maintains a continuous brick covering for a clean and cohesive look, the living spaces benefit from expansive glazing. Despite having identical floor plans across levels, variations in window placement were introduced to avoid a monotonous facade and ensure visual interest.
In the west side, the orange surfaces subtly alter the rhythm of the bricks as they transition toward the open, cubic facade on the south. This dynamic interplay of materials and volumes helps to break the monotony of a repetitive floor plan, adding vibrancy and uniqueness to the overall composition.
The parking entrance and ground floor are accentuated with a contrasting black tone, creating a distinct base that emphasizes the architectural interplay and lightness of the volumes above.